Cass County, IN should require a minimum setback of 2,640 feet from a property line to an Industrial Wind Turbine (WECS Tower).
- Fulton County IN Property Rights
- Closed on
- Target:
- Cass County Commissioners
- Region:
- United States of America
This petition is closed. Thanks to all who helped with the effort to save Cass County from predatory industrial wind developers!
Cass County, Indiana, residents and landowners should not be forced to surrender their property to an industrial wind developer for use as a noise, nuisance and employee safety easement without first having given their consent in exchange for compensation. Setbacks for Industrial Wind Turbines, also known as WECS (Wind Energy Conversion System) Towers, should require a minimum 2,640 foot setback from a property line in Cass County, Indiana. You may sign only one online or paper petition.
We, the undersigned residents and/or landowners at least 18 years of age in Cass County, IN, request that Industrial Wind Turbine WECS (Wind Energy Conversion System) Standards require a minimum setback of 2,640 feet from a property line for all commercial WECS Towers.
The Cass County, IN should require a minimum setback of 2,640 feet from a property line to an Industrial Wind Turbine (WECS Tower). petition to Cass County Commissioners was written by Fulton County IN Property Rights and is in the category Government at GoPetition.